After the grand draw had concluded
in September 1986. The station studio's were once again modified to
accommodate the ever increasing record collection and to try and utilize
as much space as possible. The lions club from Windsor was contacted by a
staff member and persuaded to donate £1000.
The station secretary/engineer used
the money to construct purpose built shelves for the records and provide
an improved layout.
Working most weekends until February
1987 when the new look studio's were opened by the lions.
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
The new look entrance from corridor, shows a new window added to studio 1 which now allows a presenter to look straight out from studio at any persons arriving at the studio |
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
On arrival through the main outside door a look to the left and reception/library/studio2 are all in view. |
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
Studio 2 from the library racks. You can just see the adjoining window for studio 1.
|
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
Studio 2 looking from reception area.
|
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
Reception looking from studio 2. |
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
One of the few colour pictures which shows the new presentation area created in studio 2. This new version of the studio was a combined area including reception and record racks.
|
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
Library racks now purposely built and facing one another. |
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
Library single rack hand made to keep the size of space taken down to a minmum. |
|
|
|
|
|
|
|
|
|
|
Studio Renovations 1986/7
|
|
Library looking from far end to amplifier cupboard and exit. |
|
|
|
|
|
|
|